ICPC Recommendations
This page was last updated on 11 May 2011
The following documents are provided on request to any organisation with a bona fide interest. Please apply using this Application Form
| No. | Issue | RECOMMENDATION |
| 1 | 12 | Recovery of Out of Service Cables |
| 2 | 9A | Cable Routing and Reporting Criteria |
| 3 | 9A | Telecommunications Cable and Oil Pipeline / Power Cables Crossing Criteria |
| 4 | 7B | Co-ordination Procedures for Repair Operations Near In Service Cable Systems |
| 5 | 7A | Standardisation of Cable Awareness Charts |
| 6 | 8A | Actions for Effective Cable Protection (Post Installation) |
| 7 | 5B | Offshore Civil Engineering Work in the Vicinity of Active Submarine Cable Systems |
| 8 | 7A | Offshore Seismic Survey Work in the Vicinity of Active Submarine Cable Systems |
| 9 | 3 | Minimum Technical Requirements for a Desktop Study |
| 10 | 2B | The Minimum Requirements for Load and Lay Reporting and Charting |
| 11 | 2B | Standardization of Electronic Formatting of Route Position Lists |
| 12 | 2B | Mechanical Testing of Submarine Telecommunications Cables |
| 13 | 1B | Proximity of Wind Farm Developments and Submarine Cables |
Note: Issue status suffix ‘A’ relates to minor format changes, not an update of the content.
Go to: